Case StudyThe Situation:
The Ridgely Avenue Bridge over Weem’s Creek, is known for its intimate waterfront and wooded residential surroundings. The original bridge was built in the 1920’s with a trestle approach, but has recently been renovated. A construction worker was looking for a durable yet slip resistant steel plate which could be removed easily if needed to access the structural beams supporting the bridge. The removable steel plates needed to be able to support expressway traffic, 24 hours a day, 7 days a week. This new modern structure was built on the alignment of the original bridge, but it improved the roadway width from 20’ to 30’ and provided a new 5’ wide sidewalk. The contractor needed a way to expand the width of the bridge while still keeping it structurally sound.



